职位名称 | 公司名称 | 工作地点 | 发布日期 | 月薪 |
---|
Senior Engineer, Pipi... | 巴斯夫一体化基地(广东)有限公司 | 广东-湛江市 | 2024/12/16 | 12500 - 25000 | |
---|---|---|---|---|---|
岗位职责:BASF is currently building a new Verbund site in Zhanjiang, Guangdong province. Announced in July 2018 and officially commenced in November 2019, BASF Guangdong Verbund site project would be BASF's largest investment with up to US$10 billion upon completion and would be operated under the sole responsibility of BASF. The site would ultimately be... |
Senior Engineer, Civi... | 巴斯夫一体化基地(广东)有限公司 | 广东-湛江市 | 2024/10/28 | 12500 - 25000 | |
---|---|---|---|---|---|
岗位职责:BASF is currently building a new Verbund site in Zhanjiang, Guangdong province. Announced in July 2018 and officially commenced in November 2019, BASF Guangdong Verbund site project would be BASF's largest investment with up to US$10 billion upon completion and would be operated under the sole responsibility of BASF. The site would ultimately be... |
工艺操作员 | 惠州伊斯科新材料科技发展有限公司 | 广东-惠州市 | 2024/07/22 | 6500 - 9000 | |
---|---|---|---|---|---|
岗位职责:1、根据班长/内操的操作指令或沟通,做出正确响应。2、执行工艺规程/操作规程,规范操作,保证安全生产。3、进行现场巡检,及时识别异常情况,采取妥当的修正措施。4、负责现场设备/管线/仪表运行监督、高风险作业监护等工作。5、记录所有的改变和跟进措施,并在交接班时交接清楚。6、积极参加各类培训和应急演练,掌握应急程序。任职要求:1、化学工程/工艺或相关专业,大... |
Senior Engineer, Mech... | 巴斯夫一体化基地(广东)有限公司 | 广东-湛江市 | 2024/10/28 | 12500 - 25000 | |
---|---|---|---|---|---|
岗位职责:BASF is currently building a new Verbund site in Zhanjiang, Guangdong province. Announced in July 2018 and officially commenced in November 2019, BASF Guangdong Verbund site project would be BASF's largest investment with up to US$10 billion upon completion and would be operated under the sole responsibility of BASF. The site would ultimately be... |
Manager, Electrical(... | 巴斯夫一体化基地(广东)有限公司 | 广东-湛江市 | 2024/07/10 | 20000 - 35000 | |
---|---|---|---|---|---|
BASF is currently building a new Verbund site in Zhanjiang, Guangdong province. Announced in July 2018 and officially commenced in November 2019, BASF Zhanjiang Verbund Site Project would be BASF’s largest investment with up to US$10 billion upon completion and would be operated under the sole responsibility of BASF. BASF Zhanjiang Verbund site would ulti... |
包装物流聚乙烯包装高... | 巴斯夫一体化基地(广东)有限公司 | 广东-湛江市 | 2024/09/24 | 6000 - 9000 | |
---|---|---|---|---|---|
岗位职责:• Monitoring of the highly automated material flow within filling operations.监控自动化包装系统作业中的自动物料流。• Responsible for the daily recheck of filling system before shift operation.班次作业前对包装系统进行例行检查。• Check bagging materials and replace in time, including film, bag, empty pallet.检查包装材料并及时进行补充,包含袋子,套... |
罐区码头操作工(004008) | 巴斯夫一体化基地(广东)有限公司 | 广东-湛江市 | 2023/09/15 | 6000 - 9000 | |
---|---|---|---|---|---|
岗位职责:1. Plant Construction• Assist in tracking the construction progress and coordinate the regional construction during construction协助建设期间项目现场施工进度跟踪,区域施工协调等• Assist in monitoring the site construction with sense of ownership and stop it in time if there is any unsafe behavior协助监督项目现场施工是否规范,发现不安全行为及时制... |
Manager, Utility Tech... | 巴斯夫一体化基地(广东)有限公司 | 广东-湛江市 | 2023/11/13 | 20000 - 35000 | |
---|---|---|---|---|---|
BASF is currently building a new Verbund site in Zhanjiang, Guangdong province. Announced in July 2018 and officially commenced in November 2019, BASF Zhanjiang Verbund Site Project would be BASF’s largest investment with up to US$10 billion upon completion and would be operated under the sole responsibility of BASF. BASF Zhanjiang Verbund site would ulti... |
Logistic supervisor,... | 巴斯夫一体化基地(广东)有限公司 | 广东-湛江市 | 2024/10/08 | 12500 - 25000 | |
---|---|---|---|---|---|
岗位职责:Objectives of the Position Manage all materials flow in/out of all warehouse inside PE battery limit and additives flow from central warehouse to PE as well as the operation in ERP systemMain Areas of Responsibilities and Key Activities Learn and obtain BASF TDS certificate Catalyst warehouses management Catalysts Storage level management (s... |
Senior Engineer, Reli... | 巴斯夫一体化基地(广东)有限公司 | 广东-湛江市 | 2024/09/25 | 12500 - 25000 | |
---|---|---|---|---|---|
岗位职责:BASF is currently building a new Verbund site in Zhanjiang, Guangdong province. Announced in July 2018 and officially commenced in November 2019, BASF Zhanjiang Verbund Site Project would be operated under the sole responsibility of BASF. BASF Zhanjiang Verbund site would ultimately be built into a role model for smart manufacturing and sustaina... |
包装物流聚乙烯仓库高... | 巴斯夫一体化基地(广东)有限公司 | 广东-湛江市 | 2024/09/24 | 10000 - 15000 | |
---|---|---|---|---|---|
岗位职责:• Manage all the automatic warehouse operation tasks in shift, evaluate and solve important operation task and abnormal task. 管理班次内自动化立体库的所有运营作业内容, 关注并解决重点任务以及异常任务。• Responsible for automatic warehouse statue and management of operators in shift, also improve team ability.负责班次内仓库的整体状态检查和人员工... |
备件仓库技术员(005057) | 巴斯夫一体化基地(广东)有限公司 | 广东-湛江市 | 2024/05/10 | 5000 - 8500 | |
---|---|---|---|---|---|
岗位职责:BASF is currently building a new Verbund site in Zhanjiang, Guangdong province. Announced in July 2018 and officially commenced in November 2019, BASF Zhanjiang Verbund Site Project would be operated under the sole responsibility of BASF. BASF Zhanjiang Verbund site would ultimately be built into a role model for smart manufacturing and sustaina... |
Supervisor, Inspectio... | 巴斯夫一体化基地(广东)有限公司 | 广东-湛江市 | 2024/11/25 | 12500 - 25000 | |
---|---|---|---|---|---|
BASF is currently building a new Verbund site in Zhanjiang, Guangdong province. Announced in July 2018 and officially commenced in November 2019, BASF Zhanjiang Verbund Site Project would be BASF’s largest investment with up to US$10 billion upon completion and would be operated under the sole responsibility of BASF. BASF Zhanjiang Verbund site would ulti... |
Engineer, Technical S... | 巴斯夫一体化基地(广东)有限公司 | 广东-湛江市 | 2024/12/19 | 8000 - 14000 | |
---|---|---|---|---|---|
岗位职责:BASF is currently building a new Verbund site in Zhanjiang, Guangdong province. Announced in July 2018 and officially commenced in November 2019, BASF Zhanjiang Verbund Site Project would be operated under the sole responsibility of BASF. BASF Zhanjiang Verbund site would ultimately be built into a role model for smart manufacturing and sustaina... |
Shift lead of EPS供电... | 巴斯夫一体化基地(广东)有限公司 | 广东-湛江市 | 2022/08/02 | 6500 - 11000 | |
---|---|---|---|---|---|
岗位职责:- 带领值班团队按照公司EHS规定和操作规程运营本装置,督导本班人员的操作,使装置正常运行- 管理好工作许可流程,确保设备维护和维修工作的安全- 负责事故处理,并采取必要措施纠正异常运行工况- 与内部与外部利益相关方保持密切沟通,使装置按计划平稳运行- 落实生产经理安排的其他任务任职要求:- 大专及以上,电厂、供电系统和电气自动化相关专业- 具有至少5年以上变电站... |
集装箱卡车物流中控室... | 巴斯夫一体化基地(广东)有限公司 | 广东-湛江市 | 2024/10/28 | 10000 - 15000 | |
---|---|---|---|---|---|
岗位职责:• Commissioning Phase• Assist the project acceptance activities and participate in the punch list inspection during mechanical completion phase协助和参与机械竣工期间的项目验收工作和现场尾项检查• Support project pre-commission & commissioning activities, e.g. PSSR, commissioning proposal drafting, equipment commissioning支持项目预试车和装置试车工... |
罐区码头高级操作员(00... | 巴斯夫一体化基地(广东)有限公司 | 广东-湛江市 | 2023/09/15 | 6000 - 9000 | |
---|---|---|---|---|---|
岗位职责:1. Plant Construction• 参与DCS, OTS, TGS, GDS, SIS, FAS等设计、组态、工厂测试、现场测试• 协助建设期间项目现场施工进度跟踪,区域施工协调等• 协助工程团队监督检验施工质量,检查施工现场是否按图施工• 协助现场工程竣工验收,参与三查四定,参与开工前的生产准备和试车2. Plant commissioning• 参与DCS, OTS, TGS, GDS, SIS, FAS等系统回路测试• 配合现场人员完成试... |
包装物流聚乙烯包装领... | 巴斯夫一体化基地(广东)有限公司 | 广东-湛江市 | 2024/09/24 | 10000 - 15000 | |
---|---|---|---|---|---|
岗位职责:• Manage all the automatic filling system operation tasks in shift, evaluate and solve important operation task and abnormal task. 管理班次内自动化包装系统的所有运营作业内容, 关注并解决重点任务以及异常任务。• Responsible for automatic filling equipment statue and management of operators in shift, also improve team ability.负责班次内包装设备的整... |
堆场操作员(006005) | 巴斯夫一体化基地(广东)有限公司 | 广东-湛江市 | 2024/10/28 | 6000 - 9000 | |
---|---|---|---|---|---|
岗位职责:• Responsible for container storage and retrieval execution in NDG and DG yard area 负责执行危货和普货堆存区域的罐箱堆存和提取• Coordinate with order officer to implement all container storage adjustment for typhoon and other extreme weather与订单专员配合实施台风天气或其他极端天气下的罐箱堆存调整• Communicate with OST driver and external driver ... |
EO/EG/MG高级工艺工程师 | 巴斯夫一体化基地(广东)有限公司 | 广东-湛江市 | 2024/01/02 | 12500 - 25000 | |
---|---|---|---|---|---|
BASF is currently building a new Verbund site in Zhanjiang, Guangdong province. Announced in July 2018 and officially commenced in November 2019, BASF Guangdong Verbund site project would be BASF\'s largest investment with up to US$10 billion upon completion and would be operated under the sole responsibility of BASF. The site would ultimately be the thir... |